Lost in the Drawings: What 21 abandoned design applications show and what practitioners might consider
Of the 21 design applications abandoned September 14 to 20, 2026 after a rejection, most were lost on the drawings, not the prior art. Three Hague designs the examiner had cleared on the art were let go over fixable drawing defects, an applicant’s own Amazon listing inside the grace period